10 Years of Updates


The lift hill has progressed to the point where it crosses with the 2nd hill

The run back is ready to connect with the curve through the lift.

Speaking of which, here is the curve through the lift structure

The brake run after the final curve

Eventually these two sections will meet up.

The crane was starting to get active right about now

All of the track that you see has been completed with metal strips

The train ride is going to be a lot more popular now
Copyright © 2009. MidwestInfoGuide