Union Station - Construction Update

 

Time to check in on the progress being made at the expansion to the Union Station park.  Notice in the concept art they have posted you can see a wave swinger, rocking ship and a rollercoaster.

Let's focus on the rollercoaster first.  It appears that they have completed the installation of the actual ride.  The track is complete and they have the ride carriages on the track

As should be no surprise, the ride carriages are themed to a train.  The first cart is the "engine" and the other four carts are themed to passenger cars.

In addition, it can now be confirmed that this will be a spinning coaster.  The ride carriages will begin with two guests seated forward and two more seated backwards on each cart.

The lift will be driven by tires, which means this coaster will not operate in wet conditions

Here is the lift hill in its entirety and you can see the winding path the ride takes after completing the lift just past it.

From the other side of the construction site you can see that the "first drop" is sort of a meandering incline that goes into a helix

After the helix it goes around this bend and then back into the station

Here you can see the changes in elevation as it goes through the course.  In the foreground you can see footers for the entrance or exit pathway to the station

Another look (in the distance) at the layout.  Not sure what the pipes are for in the foreground

The open section on the left is possibly where the rocking ship will go.  It is not currently on site

The wave swinger, however, is in the process of being constructed

The wave swinger is located at the entrance to the park coming off the street leading to Energizer Park - home to St. Louis City Soccer Club

One last photo of parts awaiting installation on the wave swinger.  In the background you can see the rollercoaster.  The park expansion is said to open sometime this summer