July 23, 2019

Mystic River Falls (SDC)

We're going to start this update from the train.  At the first access gate near the Giant Barn Swing you can look in and see two trailers full of cement forming flats.

Looking across the construction area, you can see the large green building that will house the new Ribhouse.  You can also see a lot of cement walls.

Massive electrical tubes on the side of what will become the pump house for the attraction

4 massive pump engines have been installed on this side of the pump hose.  

Now on the park side of the construction area, closest to the Playhouse Restrooms, you can see on the right what appears to be the load station for the ride.

It looks like you will enter the ride on the left and then exit on the right

The new dining patio appears to be where the exit from the ride will be.  If that is the case, that'll be a great waiting area for those not riding.

Moving on, we are now right across from the Dockside Theatre.  You can see that more stone has been brought in for thematic purposes.  Also look at how the new trees are growing in already 

A lot of twisted troughs here.  You can see a new structure has sprung up near the fence.  This might be a new lookout tower.

I found it interesting how they have applied a rock design to the trough here.  I don't know if it was hand painted or a graphic, but it really makes the cement trough look better.

Looking from the area right next to the Crossroads Pizza deck.  You can see the "bridge trough" in the distance.  There's a closer look coming later in this update.

It's promising how the thematic elements already look.  They've added more rock here and I like how the island is already greening up with weeds

Looking from the Crossroads Pizza Deck near the Restrooms you can see just how green that island is already.  You can also start to get an idea of how Ribhouse will interact with the attraction.

From the bridge to Wilson's Farm you can see the progress being made in the area where the first trough pieces were formed for the ride.

Panning left you can see that a new curved section is being formed.  The "bridge trough" can be seen in the distance.

From Wilson's Farm (just inside the area) you can get a better view of the newly formed curve

I found this area to be interesting.  It appears that we will have a water feature here that will interact with the trough.  There are poles where the water will enter the trough.

Lots of new rock that is waiting to be placed

The next views are from in Wilson's Farm near the water fountain windmill. Here's another look at that new water feature area.  You can also see the feet of the new structure that appears to be a new lookout tower for the ride.

I am guessing this cement structure in the middle will be another pump that helps power this area of the ride.

This appears to be the piece of machinery that is helping move in the new rock thematic pieces.

From the Giant Barn Swing queue, you can see the bridge and into the pump house

Here's the best view we could get of the bridge.  So there's trough over it and trough under it.  We are guessing that the large slide falls will be in here somewhere.  However it probably won't be installed until after the announcement.

One last look from the Giant Barn Swing queue.  You can see the pump house and the load building.  I don't know about you guys, but I know we severely underestimated how big this ride was going to be.  It is going to completely dwarf what the Lost River was.

Rivertown Smokehouse (SDC)


Major progress has been made on the new Rivertown Smokehouse

The first thing you'll notice is that it is much bigger than the old location.  This also appears to be the main entrance to the building

Peeking over the fence you can see the design of the windows for the building

Looking inside, you can see that they are starting to frame up the building.  It appears that some of the Back of House areas area already framed up

We're probably looking right at where the serving area will be located.  It will be fun to compare this photo to the end results later on in the build

From the back you can see the framing for the roof facade is going in place.  The HVAC units for the building will be placed on the flat portion of the roof behind the new framing.

Another look at the back of the new building.  You can also get an idea of where the new load station for the new water attraction will be located in relation to the new Ribhouse.

The new dining patio area received some rock treatment along the new cement retaining walls

Here is a better look at the rock treatment.  It will be interesting to see if that is continued along the remainder of the cement walls.

On the other side of the Lake you can see the dining patio continues to expand.  Here you can see a new electrical box has been installed.  It will be interesting to see if this is just for the area or if it will power a new food stand.

More details emerging at the dining patio.

One final look at the back of the Smokehouse.  With how quickly they progressed on this project since our last visit, we imagine that the roof will be completed and siding going up when we return

Skyscraper - NOW OPEN (The Tracks)


Welcome back to Track 3.  You'll notice that Skyscraper has been added to the main marquee

You can access the ride via this new bridge from Kidz Kountry

You'll notice that it goes right over the kiddie go-kart track.

This new dynamic attraction soars over the park and has forever changed the look of 76

Branson Buzzsaw - NOW OPEN (Branson Sawmill)

The NEW Branson Buzzsaw is now open at the Branson Sawmill (the rebranded home of the Branson Coaster)

Near the ticketing area, they have a test seat.

I found it interesting that they have turf on the loading platform.  Those tree stumps are where you store your loose articles.

It might not be the tallest swing ride out there, but it does offer some nice views of the area.