April 23, 2017

Time Traveler Construction (SDC)


We got some better pictures of the station from Sunday.  One thing I want to point out is the two openings that everyone has been saying will be the maintenance bays.

There is now a very large steel beam across those openings.

With that new beam in place, I think the original theory of a elevator style transfer track in the main loading area is looking more likely.

Let's be honest.  There is A LOT of room under the load station.

In other news, the entire building pretty much has all of its flats installed now.