Echo Hollow is being prepped for Young Christians Weekend next week. The stage awning has actually been in place for about a week now.
One thing we want to point out is that there is now a faux wall in front of the backstage building.
There is also now two "wing entrances" on either side of the stage for the artists. In the stands, there is a lot of new wood being installed to replace rotten railing. They have a lot of work to do this coming week in order to be ready for YCW.