Since our last update, the ride's marquee has been installed. We think it looks really nice
I have to admit that I am happy (and surprised) to see that the entire queue will have coverings
That is except for a few connecting areas between covers, but that is still better than what Chicago got
The control booth and ride mechanics buildings have both received joker themed paint jobs. They have also hung popcorn lights from the ceilings of the shade coverings
They have also hung lights in this section as well
A look at the connecting area between the fun house and the second part of the queue
Here is the exit from the fun house and the pathway to connect to the second part of the queue. They have added two LED light poles for this section as well
There is enough room on this side of the fun house for a walk way. I am not sure if this will be a bypass route or what
The initial set of switchbacks to be able to get into the funhouse
Here you can see the first set of switchbacks and the funhouse
Large new plaza area with brand new concrete. The exit will be to the left of the marquee sign. Both the exit for Joker and SuperGirl will be in that area
The crew doing more concrete pours to get the area ready.
Rookie Racer was closed today due to the construction
No opening date has been set yet, but we feel that they are getting closer